One consistent way of working across every project — it scales with the complexity of the job and every step can be traced back later.

METHODOLOGY

A four-layer system

LAYER 01

Design & BIM

Building Information Modelling to clash-check architecture, structure and services before any work starts on site.

LAYER 02

Planning & Cost Control

CPM programming alongside the BOQ, with cost tracking by work package throughout the project.

LAYER 03

Site Execution

System formwork, precast concrete elements and plant selected to suit the conditions of each site.

LAYER 04

Quality, Safety & Handover

Digital quality and safety checklists, with photographic records and a complete handover document set.

Using BIM to control work on a construction site
ภาพการทำงานกับ BIM / การตรวจงานหน้าไซต์public/img/technology/tech-site.jpgแนะนำ 1200 × 900 px
WHY IT MATTERS

Solve it on screen, before it becomes a cost on site

Clash-checking the drawings in BIM before work begins cuts rework on site, reduces waste and keeps the handover date on plan.

  • Full clash detection across all systems before work starts
  • Weekly progress updates and site photos for the client
  • Quality records kept and retrievable for the whole warranty period
STANDARDS

Standards we work to

EIT

Concrete and structural standards of the Engineering Institute of Thailand

TIS

Primary structural materials certified to Thai Industrial Standards

5 years

Structural warranty under section 600 of the Thai Civil and Commercial Code

100%

Every critical point QC-checked before close-out

We work to the professional standards and building regulations listed above. Should the company obtain further international management system certifications such as ISO 9001 or ISO 45001, the certificate numbers and certifying bodies will be published on the About page.